Transportation & Storage

Never attempt to wheel a machine over rough and uneven ground.  For hoisting, lifting lugs provided on the blast machine must be used. Machine weights are shown below.

Always disconnect air and blast hoses from the machine and ensure it is empty before being moved.

If the blast machine is not to be used for a period of time, it is advisable that it is emptied.  This will prevent future blockages due to condensation and abrasive consolidating in the vessel.

Always ensure that the machine is covered when left unattended to prevent the ingress of rainwater and other foreign objects.

For long term storage it is recommended to turn the machine upside down to prevent condensation from settling in the base of the vessel and the abrasive metering valve.

Machine ModelUnladen weight (Kgs)
102840
1440114
2040145
2452180

Hodge Clemco

Hodge Clemco Limited
36 Orgreave Drive
Sheffield
South Yorkshire
S13 9NR

Hodge Clemco Limited
Todwick Road
Dinnington
S25 3SE

Email: hc.sales@surfaceprep.com
Tel: 0114 254 0600

Company No.:626216
Company VAT No.:172528852

Accreditation and approvals

Made in Sheffield logoAIS logo

Institute of Corrosion logoMade in Britain logo

Sheffield Chamber of Commerce logoSafe Contractor logo

Proud to support

Sheffield Hospitals Charity Neonatal Unit Fund logoTeam Ted Foundation logo

Connect with us

Our Awards

manufacturing awards